Document Library
Document Library
  • About Us
    • The Project
  • Current Works
  • Supply Chain
    • Suppliers
    • Supply Chain Development
    • Supply Chain Registration
    • Contracting Approach
  • Join the Team
  • News
  • Contact

Moray West Supply Chain Registration

Please complete the form below if you would like to register your company’s details with Moray West, and if you consent to our sharing your information with our potential Tier 1 suppliers.

Required
Required

Country Origin

Company Address
Required
admin
(None Selected)

Moray West Key Facts

  • Consent for construction of wind farm and marine export cable granted in 2019
  • Connection to National Grid at Blackhillock substation with a new substation at Whitehillock to step up voltage, both within Moray.
  • Underground cables from landfall by Sandend in Aberdeenshire to substations.
  • Total underground export cable corridor route 96km (65km offshore and 31km onshore).
  • Up to 275 km of inter array cables between connecting the turbines.
  • Total wind farm area – 225km2.
  • Maximum turbine rotor diameter – 265m.
  • Minimum distance from shore – 22.5km.

 

  • The Project
  • Current Works
  • Document Library

Moray Offshore Wind Farm (West) Limited

Company Number: 10515140   |   VAT Number: GB 302516840
Registered Office: C/O Shepherd and Wedderburn Llp, Condor House, 10 St. Paul's Churchyard, London, United Kingdom EC4M 8AL

Linked In

info@moraywest.com

2020 Moray Offshore Renewable Power|Cookie Policy|Terms of Use|Privacy Policy| Website designed and built by Aurora Design Studio.

Moray West Cookie and GDPR Policy

As is common practice with almost all professional websites this site uses cookies, which are tiny files that are downloaded to your computer, to improve your experience.

Please follow this link on how we collect user data.

Ok