Document Library
Document Library
  • About Us
    • The Project
  • Current Works
  • Supply Chain
    • Suppliers
    • Supply Chain Development
    • Supply Chain Registration
    • Contracting Approach
  • Join the Team
  • News
    • Notice to Mariners
  • Contact

Moray West Get in touch

Moray Offshore Wind Farm (West) Limited

Atria One
144 Morrison Street
EDINBURGH
EH3 8EX

Roger McMichael - Stakeholder Manager

Tel: 0131 556 7602

roger.mcmichael@oceanwinds.com


Key Facts

Moray West is being developed to provide a secure and reliable source of energy without creating gasses associated with global warming, and without producing nuclear waste.

  • Consent for construction of wind farm and marine export cable granted in 2019
  • Connection to National Grid at Blackhillock substation with a new substation at Whitehillock to step up voltage, both within Moray.
  • Underground cables from landfall by Sandend in Aberdeenshire to substations.
  • Total underground export cable corridor route 96km (65km offshore and 31km onshore).
  • Up to 275 km of inter array cables between connecting the turbines.
  • Total wind farm area – 225km2.
  • Maximum turbine rotor diameter – 265m.
  • Minimum distance from shore – 22.5km.
  • The Project
  • Current Works
  • Document Library

Moray Offshore Windfarm (West) Limited

Company Number: 10515140   |   VAT Number: GB 302516840
Registered Office: Shepherd and Wedderburn LLP Octagon Point 6th Floor, 5 Cheapside, London EC2V 6AA

Linked In
info@moraywest.co.uk

2020 Moray Offshore Renewable Power|Cookie Policy|Terms of Use|Privacy Policy| Website designed and built by Aurora Design Studio.

Moray West Cookie and GDPR Policy

As is common practice with almost all professional websites this site uses cookies, which are tiny files that are downloaded to your computer, to improve your experience.

Please follow this link on how we collect user data.

Ok